Introduction to Sharepoint Migration testing
A migration to SharePoint Online or SharePoint 2010 from an older SharePoint platform requires careful analysis & planning Successfully completing. There are various types of migration activities, each with requiring a different approach their own unique types of data to be migrated. However, they do not have to be constrained by a limited migration approach it is vital for organizations to be aware that upgrade projects.
Sharepoint Migration testing Job Support
Sharepoint migration testing achieve an effective in migration procedure, data on the old system is mapped to an new system utilising an design for the data extraction & data loading. The design relates to an old data formats to an new system’s formats & requirements. Programmatic data migration may involve in many phases but it is minimally includes the data extraction where data is read from an old system & a data loading where data is written to a new system.
After loading into the new system, results are subjected into data verification to the determine whether data was accurately of the translated, is complete, & to supports processes in a new system. During verification, there may be any of need for an parallel run of both the systems to identify areas of a disparity & a forestall erroneous of a data loss.
Automated & a manual data cleaning is commonly performed in the migration to improve the data quality, eliminate redundant or to obsolete information, & then match the requirements of a new system. Data migration phases are (design, extraction, cleansing, load, verification) for the applications of moderate to high complexity are commonly repeated to several times before the new system is deployed.